| If you are deciding the best possible fit
| |
| | with voice and data systems, and should
|
| for your office, chances are that you
| |
| | be available for positioning either above
|
| have spoken to many vendors whom may ask
| |
| | or below the work surfaces.
|
| you for a request for proposal.
| |
| | Manufacturers of modular office furniture
|
| Responding to an RFP is an expensive and
| |
| | systems may claim to have addressed cable
|
| time-consuming piece of work, too. If you
| |
| | management in their designs. Here's a
|
| craft your RFP in too general a fashion,
| |
| | sample of what managers should look for:
|
| you'll create a formidable challenge for
| |
| | - Certified conformance to TIA/EIA TSB 75
|
| unfortunate vendors who will have to go
| |
| | and TIA/EIA -568-A
|
| back and forth asking you to make the
| |
| | - Dedicated power and dedicated voice
|
| questions more specific and then
| |
| | data cable pathways
|
| answering these questions. Even thought
| |
| | - Consolidation points supporting a zoned
|
| this may be a bulky task to undergo it is
| |
| | cable infrastructure
|
| in your best interest that you become as
| |
| | - An internal structural design that
|
| familiarized with the products'
| |
| | supports the concept of "fanned out cable
|
| specifications as you are with the
| |
| | management" behind easily removed and
|
| business whom will be handling it for
| |
| | replaced panel tile segments
|
| you. Only a really in-depth,
| |
| | - Disconnect blocks that connect
|
| comprehensive RFP will make it easy for
| |
| | horizontal cabling from the
|
| potential vendors to draw up their
| |
| | telecommunications closet to the
|
| proposals and save your own time in the
| |
| | workstation cabling to permit isolating
|
| long run.
| |
| | and testing circuits without removing
|
| A lot of consideration should go into
| |
| | cable terminations
|
| crafting an RFP (Request for Proposals)
| |
| | - A simple "plug-and-play" design
|
| to office furniture dealers and
| |
| | allowing personnel equipped with a
|
| distributors supplying
| |
| | minimum of training to add, remove or
|
| technology-compatible modular office
| |
| | reposition workspaces or cabling without
|
| systems. Some managers may place more
| |
| | disrupting the entire office
|
| weight on certain considerations over
| |
| | - Lay-in cabling runs outside structural
|
| others, but should insist that their
| |
| | framing but behind modular removable
|
| vendors strive to meet all of the
| |
| | office wall tiles. This provides more
|
| following desirable features.
| |
| | cabling capacity, pathway options and
|
| 1. Panel Considerations
| |
| | easier access
|
| You should focus on the strength and
| |
| | - Concealed cable management anchor
|
| rigidity when in use and the factors that
| |
| | points for slack cable storage
|
| enables the systems to remain
| |
| | - Easily installed data ports in several
|
| distortion-free during MACs. A new
| |
| | work area options
|
| approach called off-modular design allows
| |
| | 3. Data Throughput
|
| much greater freedom in locating bins,
| |
| | Data throughput, otherwise phrased as the
|
| shelves and divider panels.
| |
| | data handling capacity of the office
|
| Newer technologies such as knockdown and
| |
| | network, is a subject of its own.
|
| ready-to-assemble structural elements
| |
| | Companies will continue to wrestle with
|
| overcome traditional restrictions and, as
| |
| | the tradeoff between costs and the
|
| a bonus, add flexibility while reducing
| |
| | efficiencies gained with high-capacity
|
| production and erection costs. These new
| |
| | networks.
|
| features give designers and installers
| |
| | These throughputs are required to
|
| virtually unlimited options in task
| |
| | accommodate massive file transfers or
|
| tailoring today's office and workspace
| |
| | download, lighting speed Internet access
|
| layouts. Another benefit of this new
| |
| | and full-motion video to the workplace. A
|
| construction technology is the stackable
| |
| | companion decision, also a subject of its
|
| panel frame - an innovation taking office
| |
| | own, is what medium to use for office
|
| furniture systems literally to the next
| |
| | data cabling.
|
| level. Load-bearing walls 30 inches to
| |
| | However, analyzing your needs in detail
|
| ceiling high can be constructed, moved
| |
| | and making sure all your requirements are
|
| and reconfigured quickly and efficiently
| |
| | included in the document isn't enough
|
| to create spaces in harmony with the work
| |
| | either. Here are a few main things that
|
| being performed or support a wholesale
| |
| | should be included in your proposal:
|
| job change.
| |
| | 1. Information About Your Company
|
| 2. Cable Management
| |
| | 2. IT Standards
|
| Cable management for power and voice/data
| |
| | 3. Reasons for Requesting a Proposal
|
| video is a major challenge to be
| |
| | 4. Project Description
|
| addressed in technology-intensive
| |
| | 5. Time Limit
|
| workplaces. Vendors should confirm that
| |
| | 6. Proposal Description
|
| their cabling installers are trained and
| |
| | 7. Requested Information About a Vendor
|
| certified for power and data
| |
| | 8. Perfect Vendor's Image
|
| installations, and that all wiring and
| |
| | 9. Criteria for Proposal Evaluation
|
| cabling conform to local codes. Power
| |
| | 10.
|
| systems should not share channel space
| |
| |
|